The project at Talison Lithium’s Greenbushes site required the large-scale deployment of over 900,000m² of Bituminous Geosynthetic Material (BGM) to establish a tailings storage facility.
The EP7 evaporation pond at Olympic Dam, covering over 750,000m², required a highly technical, multi-layered geosynthetic lining system to contain tailings from the mine.
GeoQ’s specialist CQA supervision and Electrical Leak Detection services assured the structural integrity of over 1,000,000m² of geosynthetic liners for the ARROW Concentrated Brine Pond, the largest in the southern hemisphere.
GeoQ’s expert Dipole Electrical Leak Detection Survey for Cleanaway’s landfill cell surpassed EPA standards, ensuring operational approval and setting a new industry benchmark for compliance and environmental integrity.
GeoQ successfully ensured the quality and integrity of over 800,000m² of Bituminous Liner Material for Glencore, setting industry standards for manufacturing oversight, CQA supervision and installation excellence.
GeoQ’s proactive approach ensured flawless execution of BHP’s EP6 project by testing and verifying over 600,000 square meters of HDPE for quality, significantly reducing BHP’s environmental and financial risks.
Fill in the form below and we’ll send a copy of our capability statement to your inbox.