Origin Energy – Condabri 7 Pond

Home Projects Origin Energy – Condabri 7 Pond
  • Project Type:GeoQ third party CQA and Electrical Leak Detection
  • Date:April, 2021

GeoQ were engaged by Origin Energy to undertake, Level 1 CQA supervision, electrical leak detection (ASTM D7953- 20) Arch testing exposed geomembrane and also water covered Di-pole testing (ASTM D7007- 16). GeoQ also successfully completed commissioning process of the pond.

Project Facts:

  •  200,000m2 of 1.5mm HDPE.
  • 90,000m2 of Geonet.
  •  45,000m2 of Bituminous Liner
  •  Continuous 3 man GeoQ team dedicated to CQA and electrical leak detection activities.

Share: